Moin,
Updated and was happy to see the Smart CT functions. But why on earth one has to chose for a single phase to control and not the total calculated by the Shelly and why is the control hanging sometimes causing the PV Hub to reduce to -69 Watts and after switching and saving to another phase controll is regained frothe hub.. updated the Shelly as well but the controlled by feature is yet more than dodgy to what I experience on my setup with 4 AB1000 and a Bosswerk 600MI converter attached. Any similar experience or help how to set up to really getting to 0 return flow ?
Thanks, Niels