Regarding Equipment Situated in Germany:
The power limit of HEMS System has been modified from 2400W to 3000W.
If the set power value exceeds 3000W, installation must be performed by a certified professional electrician to ensure electrical circuit safety and compliance with relevant regulatory standards.
Regarding Equipment Situated in France:
The power limit for both HEMS System and Hyper 2000 Cluster has been modified from 2400W to 3000W.
If the set power value exceeds 3000W, installation must be performed by a certified professional electrician to ensure electrical circuit safety and compliance with relevant regulatory standards.
Ihr Zendure-Team